2D plan, 3D elevation, structural drawings: the right order
Drawings made in the wrong order turn a change that is free on paper into one that costs a wall on site. What each drawing does and when it should exist.
The order drawings, approvals and site work are meant to happen in.
Drawings made in the wrong order turn a change that is free on paper into one that costs a wall on site. What each drawing does and when it should exist.